In connection with the flow completion, the parties fixed the volume of electricity supplied from Russia during the shutdown of the IngurHES.
The development and implementation of a program for restoring the power grid infrastructure of Abkhazia, namely the modernization of transmission and distribution networks, has become one of the main topics of discussion in the Ministry of Energy.
Ozgan and Grabchak discussed the possibility of concluding a long-term contract for metering devices supply, which are urgently needed in the Republic to increase payments collection.
Delivery of materials for repair work on the Achguara high-voltage line is expected in the shortest time. There has already been formed an action plan. The Ministry of Energy of the Russian Federation expressed their readiness to provide technical support for high-quality work implementation in the shortest possible time.